Featured

Doyle Drive Presidio Parkway Project

Doyle Drive Presidio Parkway Project

The Presidio Parkway serves as a regional gateway between the Golden Gate Bridge and the City of San Francisco. The parkway is a replacement of Doyle Drive, a 1.6-mile segment of U.S. 101 that reopened on July 12, 2015. Caltrans and the San Francisco County Transportation Authority jointly led the effort to replace Doyle Drive.

A community-backed design for the Presidio Parkway was chosen in 2009 after years of intensive regional coordination, environmental review, and interagency planning. The project was carefully designed to withstand the maximum considered earthquake for the region, improve traffic safety, and improve access to the Presidio and Golden Gate National Recreation Area.

Caltrans worked with GBL and Valmont to develop a custom lighting pole specifically for the Presidio Parkway.

https://www.sfcta.org/projects/presidio-parkway
Valmont https://www.valmont.com/